Studio guide

Kiln firing log

Before firing record kiln, program, firing type, load, target cone, hold and witness-cone placement.

Procedure

  1. Before firing record kiln, program, firing type, load, target cone, hold and witness-cone placement.
  2. After firing add duration, cost or energy, cone image, zone differences, element condition and ware results.
  3. Comparing firings can reveal drift before a major failure or a batch of underfired work.

What to record in CeramikaTo

  • Work or sample code and date.
  • Material, batch, cone, schedule and position.
  • Observation separated from hypothesis.

Common mistakes

  • Changing several variables at once without a control sample.
  • Missing batch, cone or kiln-position information.
  • Treating an estimate as a guarantee.
Limit

This guide supports documentation and test planning. It does not replace manufacturer instructions, safety training or specialist assessment of functional ware.

FAQ

Can I use this procedure for every clay?

You can keep the record structure, but parameters must come from your tests and manufacturer data.